Shopping Cart

KM Elite Extra Long Lead Rope

£8.99 GBP (tax included) £0.00 GBP
Colour
Black
Pastel Blue
Baby Blue
Green
Yellow
Red
Purple
Raspberry
Navy
Orange
Baby Pink
Quantity
Only 30 left
Inventory quantity : 30

The KM Elite Extra Long Leading Rope is a high quality double braided round cotton lead rope that offers luxurious comfort and is available in a range of colours with a brass plated swivel bolt snap. Available in Black, Pastel Blue, Baby Blue, Green, Yellow, Red, Purple, Raspberry, Navy, Orange or Baby Pink.

Size Guide

Available in 7ft.